SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397 8021 / 8041 JEEP JK SYNERGY STAGE 1 SUSPENSION SYSTEM GENERAL NOTES: • T
• Attach the new track bar relocation bracket to the factory bracket as shown with the new 9/16” bolt and lock nut; use a flat washer under the bolt
• Torque the lug nuts to 85125 ft-lbs. 20. FRONT END ALIGNMENT • The castor should be optimal with the cam bolts maxed for the most castor. • Ad
2. Read all the following steps before beginning installation. If you do not have the proper tools or ability to install the components proper
• Remove the cam positioning tabs from the LCA mounts. You can purchase 8004-01 JK Cam Bolt Knockout Tool or if you have the proper tools you can cut
Figure 5-2 Figure 5-3
Figure 5-4 • Reinstall the lower control arms using the new cam bolts. Use anti-seize liberally on the cam bolts and washers. Position the cam bo
• Wait to torque the new cam bolt until the vehicle is on the ground. 6. BUMPSTOP SPACERS AND COIL SPRINGS • Locate and center punch the center
7. SHOCKS • Install the shocks using the stock lower mounting nut/bolt. Use the new stem bushings, washers and nuts. • Tighten the lower bolts t
REAR SUSPENSION 11. REMOVE STOCK PARTS • Disconnect the rear track bar at the axle bracket. It is easiest to do this when the suspension is at t
Figure 12-1 14. INSTALL REAR TRACK BAR RELOCATION BRACKET • Cut part of the factory track bar off as shown in the following pictures. The
Commentaires sur ces manuels